The construction of an impressive Eden Tower in Frankfurt is in progress

The construction works have been completed at the structural levels, above the roof level. The substructure for the facade access system is currently under construction. The assembly of the substructure of the facade reached the 17th floor, whereas the assembly of the facade elements reached the 13th floor.

Parallel to these works, the glass assembly from the 17th to 13th floor is being carried out. Works on  the “green” areas are to start in April 2021, while roofing works in March 2021.

During the execution of this project, cmT provides construction management, project management and property supervision services in accordance with LPH8.