Project and Construction management
Warsaw Corporate Center, Warsaw, Poland
Office building class A Warsaw Corporate Centre with about 6,000 m² of leasable space is located in the centre of Warsaw, on the corner of Emilii Plater and Nowogrodzka streets and is the first American investment in Poland after the opening of the borders. The building was equipped with ventilation, air exhaust and air conditioning system. The first phase involved analyzing the technical condition of the building.
cmT scope of services:
- Technical Due Diligence
- Preparing the offers
- Construction management for modernization of the ventilation system and the property management system
cmT carried out site inspections of the following elements of the building:
- Roof and facade
- Construction and finishing
- Maintenance and building installations
- Documentation control and opinion
- Tests
cmT also managed modernization of the ventilation and air – conditioning systems using the existing components of the installation and optimization of the Building Management System (BMS) based on the formerly installed mechanisms. Owing to detailed checking and repairs, the installation dating back to the 1990s didn't need to be completely replaced. In comparison with the exchange costs the repair allowed to save 70% of the
03.2010
8 860m²
Office building